ABSTRACT
The purpose of the study is to design a system that will be in charge of capacity utilization measurement system especially in production companies which the case study is Anammco Nig. Ltd. Enugu) and to develop a computer packages whereby the technique observed from the manual method can be improved on. It is a known feet that the manual method of capacity utilization measurement in production has been associated with lots of inaccuracy in capacity utilization and this has lead to early break down of parts when in service. The software when developed will facility and enhanced the mode and methods of capacity utilization in spare parts production of Anammco.
ORGANIZATION OF WORK
Chapter one with the introduction and the foundation laying of the project work.
Chapter two deals with the review of literature relevant to the actualization of this project work.
Chapter three deals with the analysis of the existing system in it’s entirely as well as its short comings.
Chapter four deals with the design of the new system, with its specifications and requirement.
Chapter five deals with the implementation of the new system.
Chapter six deals with the implementation of the new system.
Chapter seven deals with the recommendations and conclusion.
TABLE OF CONTENTS
CHAPTER ONE
1.1 STATEMENT OF PROBLEM 3
1.2 AIMS AND OBJECTIVES 4
1.3 PURPOSE OF STUDY 4
1.4 SIGNIFICANCE 5
1.5 SCOPE/DELIMITATION 5
1.6 LIMITATION OF STUDY 5
1.7 ASSUMPTION OF STUY 6
1.8 DEFINITION OF TERMS 6
CHAPTER TWO
CHAPTER THREE
3.1 FACT FINDING METHOD/METHODOLOGY 10
3.2 ORGANISATIONAL STRUCTURE/ORGANOGRAM 11
3.3 OBJETIVES OF THE EXISTING SYSTEM 11
3.4 INPUT, PROCESS AND OUTPUT ANALYSIS 12
3.4.1 INPUT ANAYSIS 12
3.4.2 PROCESS ANALYSIS 13
3.4.3 OUTPUT ANALYSIS 13
3.5 INFORMATION FLOW DIAGRAM 14
3.6 PROBLEMS OF THE EXISTING SYSTEM 15
3.7 JUSTIFICATION FOR THE NEW SYSTEM 16
CHAPTER FOUR
4.1 DESIGN STANDARD 17
4.2 OUTPUT SPECIFICATION AND DESIGN 17
4.3 INPUT SPECIFICATION AND DESIGN 18
4.4 PROCEDURE CHART 20
4.5 SYSTEM FLOWCHART 21
4.6 SYSTEM REQUIREMENTS 22
4.6.1 HARDWARE REQUIREMENT 22
4.6.2 SOFTWARE REQUIREMENT 22
CHAPTER FIVE
5.1 DESIGN STANDARD 23
5.2 PROGRAM FLOWCHART 23
5.3 PSUEDOCODE 29
5.4 CODING 31
5.4.1 TEST DAT/TEST RUN 31
5.5 USER TRAINING –AN OVERVIEW 31
5.6 CUTOVER PROCESS 31
CHAPTER SIX
6.1 PROGRAM DOCUMENTATION &nbs
1 - 5 of 96 Reviews |