...Making Research more of a fun
Putting smiles in the face of Students
Writing your project with precision
AFRICA'S LARGEST ONLINE
PROJECT ARCHIVES
Search Projects materials, seminars, assignments etc.
Get Professional help. Access 10000+ Works,
Over 300 Software Implementations.
...Get It Done In Record Time
DEPARTMENTS
agricultural education proje ... 0
accounting project topics 669
accounting projects topics & m ... 70
agricultural education project ... 13
agricultural engineering proje ... 33
applied biochemistry projects ... 6
banking and finance project to ... 196
biochemistry project topics an ... 2
biology education project topi ... 12
building technology project to ... 3
business administration projec ... 458
business education project top ... 5
business management project to ... 448
chemical engineering 22
chemical pathology projects to ... 6
chemistry project topics and m ... 17
co-operative and rural develop ... 99
co-operative economic and mana ... 99
computer science project topic ... 351
crop science project topics & ... 1
education project topics and m ... 319
education projects topics and ... 38
electrical and electronic proj ... 54
english language and literatur ... 7
estate management project topi ... 25
fashion design technology proj ... 12
fashion design technology proj ... 10
food science project topics an ... 199
geoinformatics and surveying p ... 4
home economics education proje ... 6
igbo language education projec ... 3
industrial chemistry project t ... 15
industrial chemistry projects ... 29
information technology project ... 2
insurance project topics 63
international relation project ... 26
introductory technology educat ... 1
latest mathematics education p ... 10
library and information scienc ... 2
list of chemistry science educ ... 8
list of computer science educa ... 45
list of economics education pr ... 16
list of english language educa ... 29
list of integrated science edu ... 25
marketing project topics 285
mass communication project top ... 272
mathematics projects topics an ... 1
mba projects topics and materi ... 81
mechanical engineering project ... 128
medical laboratory projects to ... 10
medical radiography and radiol ... 8
microbiology projects topics a ... 104
nursing project topics and mat ... 4
nursing projects topics and ma ... 15
nutrition and dietetics projec ... 22
office technology and manageme ... 128
peace studies and conflict res ... 19
philosophy projects topics and ... 7
physical and health education ... 5
physics options project topics 17
physis education project topic ... 2
physology project topics 3
political science project topi ... 6
printing technology projects t ... 2
projects topics and materials ... 2
purchasing and supply project ... 43
quantity surveying project top ... 1
sociology & psychology project ... 4
sociology and anthropology pro ... 17
statistics project topics and ... 52
thesis topics & materials for ... 11
thesis topics materials for fa ... 0
Select Department
Get the complete project material now!

User Guide before placing order for complete project topics and materials:

It is important that the researcher knows exactly what he is go to do so that I could be done effectively.Make sure you update any research work you purchased on our website. Do not copy word for word. Using our research is legal. Our aim is to provide project topics and materials for easy access to information and to reduce stress of moving from one book stop or library to another in the name of sourcing for one research textbook or research materials. We do not encourage any form of plagiarism. Our aim is to generate research project ideas for students. The contents of the project material provide will help students to generate new ideals. Every researcher must look around him in his immediate environment and beyond to improve the work. To order the below complete project materials, Make payment deposit or cash transfer into any of the following banks:

GTBANK

Account Name: Chi E-Concept Intl, Account Number: 0115939447

Other payment options

We accept cash deposit, cash transfer and Bitcoin.

Click on download to complete your order.Call or Whatsapp +23408063386834

CLICK HERE TO CHAT WITH OUR CUSTOMER SUPPORT TEAM ON WHATSAPP

ABSTRACT

In the mechanical Engineering department of institute of management and technology there and many machines but not all in are good shape or form. This may be due to inadequate maintenance, which is evident in the breakdown of air conditioner. In the case of machine maintenance, the quality and effusiveness of material were well noted. Also not left behind was the cost of maintenance which was minimized and yet getting to a highly successful repairs too.  In so long, during the repairs and rehabilitation of a faulty air conditioner appropriate tools, cost and quality of material were well considered.

 

TABLE OF CONTENT

CHAPTER ONE

  1. Introduction

1.1     literature review

 

CHAPTER TWO

  1. Analysis of the air conditioning cycle

2.1     air conditioning maintenance

  1. Preparation for repairs
  2. Fault detection and repairs
  3. Precaution taken
  4. The principles of operation of an air conditioner
  5. Component of air conditioner
  6. Air condition application
  7. Sequence of operation
  8. Cost analysis

 

CHAPTER THREE

  1. Conclusion
  2. Recommendation

Reference

 

 

 

 

CHAPTER ONE

 

  1. INTR9ODUCTION

1.1     LITERATURE REVIEW

          Air conditioning is a process whereby heat received from a low temperature region is transferred to a higher temperature region.  Then a negative net work is being done in the system.  Air conditioning system has four basic components which are the compressor, condenser, metering device or thrilling valve and an evaporator.  When any of these component is faulty or damaged it will cause the air condition system not to function well or not functioning at all.

          In the first place the faulty air conditioner was rehabilitated as a project by a group of students in the department of mechanical engineering 2004/2005 session.

          Before working in the air conditioner by the group in the year 2005 the following fault were dictated.

  1. It has low pumping that is the compressor not pumping any gas (refrigerant) in the system.
  2. The capacitors of the fan and compressor are bad.
  3. The drier was not able to filter the gas pumped by the compressor as result of blockage by impurities.
  4. The whole system was dirty, this is because the air conditioner have been dumped for a very long time.

The compressor is the heart of all air conditioning system.  It pumps the refrigerant to the whole system.

The metering device or the expansion device meters a given quality of refrigerant required for each unit.

          In this case most of these essential components of the air conditioner which seems to be very delicate, need not be handled carelessly, when it developed any fault and again, it should not be handled by non-exports in the field of air conditioning and refrigeration.

          The last group that handled the project are classified as non-exports in the field of air conditioning.  We say this because an air conditioning system that has the problems outlined above needs not be repaired as they had done without replacing some of the components with a brand new spare parts and the normal size that is the size of the machine air conditioner

          For instance a compressor that has low pumping action, we verified that the compressor which supposed to b e two horse power (2hp) compressor.  This under sized compressor has low pumping action, 6to the air conditioning set.  Because the capillaries for the two horse power compressor for the bigger than that of 1.5 horse power air conditioning set.

          Again the volume of air conditioning gas being pumped was too negligible to bring about the desired cooling.

          The capacitors which was bad that is not good at all.

          The drier which was blocked up by impurities was changed and replaced with a new one.  As a result, its caused by poor cycling of refrigerant through.  The copper capillary of the air conditioner which we repaired by replacing the drier with a new one. Through we can still be in a good condition.

          A repaired and rehabilitated equipment is supposed to be sound both internally and externally.  The people who worked in the air conditioner before, were unable to spray the air conditioner which has many scratches as a result of their work.

          Sincerely speaking and other criteria that contributed immensely to the braked own of the air conditioner was poor maintenance.

          Plant maintenance is the upkeep of plant safe working state.  Plant maintenance is divided in to planned preventive and breakdown maintenance were sub-divided.

          Thus this report encomprises, urges the series of job done to arrive at a meaningful randy to breakdown problem.

          Considering space, volume and relevance we will limit our write up (thesis) to the direct and practiced work of all the air conditioner.

          In the first place we used the basic procedure in tracing a fault like diecking of leakage with soap solution was done, flushing of the condenser which revealed the fault of the drier (filter) was done using vacuum pump.  The compressor was tasted, there was no fault only that the size was 1.5 horse power (hp) and they have opened the compressor before and welded it which is not advisable to do.

          The general dean up of all dust compacted parts was done particularly without any problems following by the changing of the plug which supply electricity to the system.

          The sequence of operation and fools used during the repair is recorded in ascending order over leaf.

CHAPTER TWO

 

  1. ANALYSIS OF THE AIKR CONDITIONING CYCLE

High = 16.20 bars (150psi)

Low  = 9.65 (300psi)

          Using freon 22 as refrigerant

At 16.2 bar = 02.50c

Hf = h3 = 9.8.5kj/kg

Hg = h2 = 209.86 kj/kg

Sf = s3 = 0.34395 kj/kg

Sg = s2 0.6756 kj/kg

At = 9.65 bars – 400c

Hf = 74.5 kj/kg

Hg = 203.20 kj/kg

Sf = 0.2718 kj/kg

Sg = 0.6825 kj/kg

          From s1 = s2 =S

S = sf + x (sg + sf)

X =    0.6756   – 2718   =  0.438   =  0.983

      0.6828     0.2718    0.4107              

hi = hf + x (hg -hf)

    = 74.59 + 0.985 (203.2 – 74.59)

    = 74.59 + 0.938 (120.61)

    = 201.10kj/kg

from s3 – s4 = S

s=sf + x4 (sg - sf)

0.3495 = 0.2718 + x4 (0.6825 – 0.2718)

X4 = 0.343950.2718 = 0.7215 = 0.176 

          0.6825      0.2718   0.4107

h4 = hf + x4 (hg - hf)

H4 = 74.59 + 0.176 (203.2 – 74.59)

H4 = 74.59 + 0.176 (129.61)

H4 = 97:23 Kj/Kg

From S1 =S2

S = Sf + X (Sg - Sf)

0.6756 = 0.2718  +  (0.6825 – 0.2718)

X1 = 0.67560.2718 = 0.4038 = 0.983

          0.6825    0.2718    0.4107

h1 = hf + x1 (hg - hf)

h1 = 74.59 + 0.983 (203.2 – 74.59)

     = 74.59 + 0.983 (128.61)

     = 201.01 kj/kg

From S3 = S4 = S

S = sf + x4 (sg - sf)

0.34395 = 0.2718 (0.6825 – 0.2718)

X4 = 0.34395 – 0.2718 = 0.176

Or = 0.6825 – 0.2718 = 0.4107

H4 = hf + X4 (hg - hf)

H4 = 74.95 + 0.176 (203.2 – 74.59)

H4 = 74.59 + 0.176 (128.01)

H4 = 97.23 kj/kg

coefficient of performance (c.o.p)

= Q41 = hf – h1 = 201.0197.23

   W12   h2 – h1   209.86    201.01   

= 103.78 = 11.73

   8.85



Get the complete project material now!

CUSTOMER'S REVIEW
blessing
I so much appreciate, keep the good work on.
excellent customer support
I am happy, my project was great.
ohikhueme sylvanus
Please i need theses on Leadership and good governence in nigeria: Imperative of security in nigeria, please i would glad if my message is answered immediatly. Thanks
Tony
This site have all scholars needs for their project, i can testify to that.
Rita
A site with great relief to scholars.
1 - 5 of 96 Reviews
PROJECT INFO

UID : 12278 PRICE : 5,000.00

Download Now
Related Topics


Payment Name Phone Number
Email Address Payment Date
Gender Payment method